NERC TO Exam

The Communications and Data domain of the NERC TO exam: COM-002 repeat-back, COM-001 communication capability, EOP-004 event reports and the notifications in TOP-001-6.

Practicing for the NERC TO? Take the free practice test: 15 questions, no account needed.

Communications and Data is 12 of the 100 scored questions on the NERC Transmission Operator (TO) exam. NERC's TO content outline splits it into reporting requirements (3), communication methods such as three-part communication and RCIS (3), data validity and verification (4), and telemetry and communications equipment (2). The same rules come up in emergency questions too, because an instruction or a report is often how a scenario ends.

This guide covers who must say what, to whom and how fast, in the standards in force in late 2026. Data validity is covered with the state estimator in NERC TO contingency analysis and Real-time Assessments.

Operating Instructions

NERC's Glossary defines an Operating Instruction, in paraphrase, as a command from operating personnel responsible for Real-time operation of the BES to change or preserve the state, status, output or input of a BES Element or Facility. Discussing general information or options isn't a command and isn't an Operating Instruction. (NERC's Board adopted a revision on October 26, 2026 that would add Computational Load Sites; it isn't in force until it's approved and given an effective date.)

The term replaced Reliability Directive, retired in 2017, so Operating Instructions apply at all times, not only in emergencies. Who has to follow them:

  • A Transmission Operator follows its Reliability Coordinator's Operating Instructions unless they can't be physically carried out or would violate safety, equipment, regulatory or statutory requirements, and tells the Reliability Coordinator if it can't (IRO-001-4).
  • Balancing Authorities, Generator Operators and Distribution Providers follow the Transmission Operator's Operating Instructions on the same terms and say when they can't (TOP-001-6 R3, R4). The Transmission Operator does the same for its Balancing Authority's instructions (R5, R6).

Three-part communication: COM-002-4

COM-002-4 doesn't use the phrase "three-part communication", but its protocol is what the outline means: issue, repeat back, confirm. Each Balancing Authority, Reliability Coordinator and Transmission Operator must have documented protocols that, at a minimum:

  • use English unless agreed otherwise (another language may be used internally);
  • for an oral two-party, person-to-person instruction, have the issuer confirm a correct repeat-back, reissue if the repeat-back is wrong or the receiver asks, or take another action if there's no response or the receiver didn't understand;
  • have the receiver repeat it back, not necessarily word for word, and get confirmation, or ask for it to be reissued;
  • for a one-to-many "burst" instruction, confirm that at least one receiver got it;
  • say when a time must be stated and in what format, and how transmission interface Elements and Facilities are named.

Operators must be trained on the protocols before they issue an Operating Instruction, and the entity assesses adherence and effectiveness at least once every 12 calendar months (R4). During an Emergency, the repeat-back and confirmation aren't just protocol; they're required directly, and burst instructions must be confirmed (R5 to R7).

Worked example 1. An original exchange between a Transmission Operator and a generator:

Transmission Operator: "Lakeside Generating, this is North Area TOP, Rivera. At 14:20, reduce Unit 2 to 150 megawatts."

Generator Operator: "North Area TOP, this is Lakeside, Chen. At 14:20, reduce Unit 2 to 150 megawatts."

Transmission Operator: "That's correct."

That's the three parts. If Chen had repeated back "Unit 3", Rivera would reissue the instruction, not just correct the word. If there had been no repeat-back at all, Rivera would take another action rather than assume it was understood.

Communication capability: COM-001-3

  • A Transmission Operator must have Interpersonal Communication capability (any medium that lets people interact) with its Reliability Coordinator, each Balancing Authority, Distribution Provider and Generator Operator in its area, and each adjacent Transmission Operator.
  • It must designate Alternative Interpersonal Communication with its Reliability Coordinator, Balancing Authorities in its area and adjacent Transmission Operators: a substitute that doesn't use the same infrastructure.
  • It tests the alternative at least once each calendar month, and if a test fails, starts repair or replacement within 2 hours.
  • If its Interpersonal Communication fails for 30 minutes or longer, it notifies the affected entities within 60 minutes of detecting the failure.

The RCIS in the outline is the Reliability Coordinator Information System: in the Glossary's words, paraphrased, the system Reliability Coordinators use to post messages and share operating information in real time.

Notifications in TOP-001-6

  • Emergencies (R8): tell the Reliability Coordinator, known impacted Balancing Authorities and known impacted Transmission Operators about actual or expected operations that result in, or could result in, an Emergency.
  • Tool and telemetry outages (R9): tell the Reliability Coordinator and known impacted entities about all planned outages, and unplanned outages of 30 minutes or more, of telemetering and control equipment, monitoring and assessment capabilities, and their communication channels.
  • SOL exceedances (R15): tell the Reliability Coordinator what was done to return within limits.

Event reporting: EOP-004-4

A Transmission Operator has an event-reporting Operating Plan and reports listed events by the later of 24 hours after recognizing that the threshold was met, or the end of the next business day (4:00 p.m. local time). It uses the form in EOP-004-4 Attachment 2, or DOE's OE-417 where that report is required. Events a Transmission Operator reports include:

Event Threshold
Firm load shedding during a BES Emergency 100 MW or more, manual or automatic
System-wide voltage reduction during a BES Emergency 3% or more
Voltage deviation on a Facility during a BES Emergency 10% or more of nominal, for 15 continuous minutes
Uncontrolled loss of firm load during a BES Emergency 15 minutes or more: 300 MW if last year's peak demand was 3,000 MW or more, otherwise 200 MW
System separation an island of 100 MW or more
Transmission loss 3 or more BES Facilities from a common disturbance, contrary to design
Unplanned control center evacuation 30 continuous minutes or more
Complete loss of Interpersonal and Alternative Interpersonal Communication, or of monitoring or control, at a staffed BES control center 30 continuous minutes or more

The table also covers damage to Facilities, physical threats and loss of off-site power to a nuclear plant. EOP-004-5 takes over on October 1, 2027.

Worked example 2. At 02:10 on a Saturday, a Transmission Operator sheds 120 MW of firm load during an Emergency. That meets the 100 MW threshold. Twenty-four hours later is Sunday 02:10; the end of the next business day is Monday at 4:00 p.m. (assuming Monday isn't a holiday). The later of the two is Monday at 4:00 p.m. The real-time calls to the Reliability Coordinator happen long before that, under the Transmission Operator's Emergency plans; the EOP-004 report is the after-the-fact record. Monday afternoon is only NERC's deadline, though. On the US Department of Energy's Form DOE-417 (the OE-417 report EOP-004 accepts in place of its own form), firm load shedding of 100 MW or more under emergency operational policy is an Emergency Alert, due within 1 hour of the incident. Follow your company's procedure for who files it.

Cyber incidents

Exam Resource Materials doesn't list the CIP standards among those of primary interest, but reporting is on the outline. Under CIP-008-6, an entity reports a Reportable Cyber Security Incident to the E-ISAC and, in the US, the federal agency named in the standard within 1 hour of determining it, and an attempt to compromise an applicable system by the end of the next calendar day. Operators mainly need to know to escalate under their company's response plan.

The NERC TO study plan puts this domain in week 6, and NERC TO emergency operations and system restoration shows how the reporting rules meet an evacuation. Practice them on the free NERC TO practice test and the full NERC TO practice exams.

Free to share: you may copy and share this guide unchanged, for non-commercial purposes such as teaching and study, if you credit ExamVanta and link to this page. It's licensed under CC BY-NC-ND 4.0. Material from other sources quoted or shown in it, such as official text or chart excerpts, keeps its own terms.