NERC Transmission Operator practice exams

Take 20 full 3-hour NERC TO practice exams before test day.

Each has 120 original questions weighted like NERC's six domains, with your score set beside NERC's cut score (76 of 100 scored) and every answer explained with its sources.

Practice tests
20
Questions each
120
Areas covered
6
Minutes each
180
Take the free practice testGet all 20 practice tests for $79

Free test: 15 questions with every answer explained, untimed or at the real test's pace, no account needed.

Other names: NERC TO exam, NERC Transmission Operator exam, NERC Transmission Operator certification, NERC TO certification, NERC certification exam, NERC system operator certification exam, NERC system operator exam, NERC TO test.

Check your version. This pack covers the NERC Transmission Operator (TO) exam (120 questions, 100 scored), not the RC, BT or BI system operator exam. Your invitation or candidate guide names the test you'll take; make sure they match.

What's in the NERC TO practice pack

$79 one-timefor 20 full tests ($3.95 a test)

Get all 20 practice tests for $79

Lifetime access. It doesn't expire, so if your test date moves, your pack waits.

Retakes: NERC requires 42 calendar days between attempts, and each attempt costs $700. Sources

No subscription, no renewal. We never see your card number.

Choose the date to count down to it.

Everything in the NERC TO pack, line by line

Practice on the clock

  • 20 full practice tests, each with 120 original questions
  • Every section on its own published time limit, with no pause
  • The real test's on-screen tools: basic and scientific calculators, strike out, highlight and a scratch pad
  • Time and a half or double time, if you'll have extra time on test day

Fix what you miss

  • The right answer and a worked explanation for every question
  • Every question you miss comes back 2 days later, then again, until you've answered it right on two different days
  • Drills by area on questions from your finished tests, with the answer right after each one

Know where you stand

  • Your score for each area, and the time you took
  • The likely range of your accuracy on questions like these, next to the 76% pass mark the publisher states, never a pass prediction
  • From your second finished test on, any area that sits clearly below or above your overall score, once it has enough answers
  • Where the clock ran short, and the questions you may have rushed or got stuck on

Get to test day on a plan

  • Add your test date for a day-by-day plan: as many full tests as fit, each one gone over, rest days, and a file for your calendar
  • Email reminders only if you turn them on, five at most
  • Retake any practice test as often as you like
  • A free practice test to try first

NERC TO sample questions with answers

14 questions from the last practice tests in this pack, across every area. Choose an answer to check it, or open the answer and the working.

  1. Question 1 · Transmission

    Eastby 138 kV has three 20 Mvar capacitor banks and about 1,450 MVA of short-circuit capacity. A steel plant on the bus runs six-pulse drives that inject strong 5th- and 7th-harmonic current. Tonight's peak will need about 50 Mvar of support at Eastby, and the area's units can supply the rest. How many banks should the TOP switch in?

    1. Switch in the three banks, covering the 50 Mvar from capacitors
    2. Switch in no banks, covering the 50 Mvar from the units
    3. Switch in two banks now and the third at the peak if voltage sags
    4. Switch in two banks, covering the rest from the units

    Show the answer

    D. Switch in two banks, covering the rest from the units Why D is best: A bank and the system form a parallel resonance near the harmonic order √(short-circuit MVA ÷ bank Mvar). At 1,450 MVA, one bank (20 Mvar) gives about 8.5, two (40 Mvar) about 6.0, and all three (60 Mvar) about 4.9, which sits on the 5th harmonic the drives inject. Two banks leave the resonance midway between the 5th and 7th, and the units can supply the remaining Mvar (VAR-001-5 R2 and R3). The resonance is a steady-state condition, not a switching transient, and the problem is the third bank, not every bank.

    Why the others aren't:
    A. More capacitance moves the resonance down toward the 5th harmonic, so the third bank, though it adds Mvar, puts the resonance on the 5th harmonic that the drives inject.
    B. One or two banks resonate near the 8.5th and 6th harmonics, away from the 5th and 7th, so they are not the problem; ruling out every bank gives up support that the units would have to supply.
    C. Keeping the third bank for the peak would suit a bus with no harmonic sources, but whenever it goes in, the three banks resonate near the 4.9th harmonic, on the 5th that the drives inject.

    Sources: VAR-001-5, R2 and R3; Miller and Malinowski, Power System Operation, 3rd ed. (shunt capacitor banks)

  2. Question 2 · Communications and Data

    SCADA analog points carry reasonability limits as well as operating limits such as a line's Normal Rating. What is a reasonability limit for?

    1. To flag analog values that have not changed within a set time
    2. To flag changes between scans larger than a set rate
    3. To flag analog values beyond the physical range of the measured quantity
    4. To raise an operator alarm when a flow reaches the Facility's rating

    Show the answer

    C. To flag analog values beyond the physical range of the measured quantity Why C is best: A reasonability limit bounds what a measurement could plausibly be: no more than a unit's capability, a bus voltage within a broad physical range. A value outside it is flagged as questionable because the data, not the system, is probably wrong. Operating limits such as Normal and Emergency Ratings describe what the equipment can carry, and crossing them is a real condition to act on. Confusing the two either ignores real exceedances or treats bad data as an emergency.

    Why the others aren't:
    A. Flagging values that haven't updated within a set time is the stale-data check TOP-010-1(i)'s guidance lists separately; a reasonability limit bounds the value's size.
    B. A rate-of-change check, where a system has one, flags jumps between scans; a reasonability limit bounds the value itself, at the edge of what the quantity could physically be.
    D. Alarming at the rating is the job of the operating limit; a reasonability limit sits at the edge of the physically possible, well beyond any rating.

    Sources: TOP-010-1(i), R1 (Guidelines and Technical Basis: data outside a prescribed data range); NERC Glossary of Terms: Emergency Rating; Thomas and McDonald, Power System SCADA and Smart Grids

  3. Question 3 · Resource and Demand Balancing

    During a close-in fault at Glenden 345 kV, cleared in 4 cycles, the Glenden PMU recorded 61.9 Hz for one sample before returning to 60.00 Hz. No other PMU showed an excursion, and no generator tripped. A GOP asks whether its unit's frequency relay failed to operate. What is the best explanation?

    1. The fault's phase jump distorted the PMU's frequency estimate for one sample
    2. Rotors near Glenden briefly sped up to 61.9 Hz during the fault
    3. Interconnection frequency briefly reached 61.9 Hz, too fast for the other PMUs to catch
    4. The Glenden PMU failed during the fault, leaving its event record unusable

    Show the answer

    A. The fault's phase jump distorted the PMU's frequency estimate for one sample Why A is best: Frequency is computed from the voltage waveform's phase over time, so the abrupt phase-angle jump when a fault occurs or clears can produce a one-sample spike that is not a real change in rotor speed. That is why PRC-024-4 requires frequency for protection to be calculated over a time window (typically three to six cycles) rather than instantaneously, and why PRC-029-2 does not calculate rate of change of frequency during a fault. The relay was right not to trip.

    Why the others aren't:
    B. Large rotating masses cannot change speed by nearly 2 Hz within a few cycles; the spike is a calculation artifact, and the relay was right not to trip.
    C. A real excursion of that size would appear on every PMU and move generator outputs; only the PMU at the fault location saw it.
    D. The PMU worked; its frequency estimate was distorted for a moment by the phase jump, and its other data from the event remain valid.

    Sources: PRC-024-4, Attachment 1 (footnote: frequency calculated over a time window, not instantaneously); PRC-029-2, R3 (RoCoF not calculated during fault occurrence and clearance)

See all 14 sample questions
  1. Question 4 · Contingency Analysis and Reliability

    At 17:42 a generator trip leaves the Laurelport–Hartcroft 230 kV line, the main supply to the Laurelport area, at 112% of its 15-minute Emergency Rating, its highest, with no Contingency. The fastest generation in the area needs 25 minutes, no switching helps, and the RC reports that no relief from outside can arrive within 15 minutes. Shedding 70 MW of Laurelport load by SCADA would bring the line within that rating in 2 minutes. Which response is most appropriate?

    1. Start the area generation, and carry the overload for its 25 minutes
    2. Shed the 70 MW by SCADA now, with the area generation started
    3. Have the RC approve dropping the 70 MW, then start the area generation
    4. Open the Laurelport–Hartcroft line, and start the area generation

    Show the answer

    B. Shed the 70 MW by SCADA now, with the area generation started Why B is best: With no Contingency, flow above the highest Emergency Rating has no time allowance (FAC-011-4 R6.1.1), and every other action takes longer than the overload can safely last. When no other available adjustment can act in time, shedding load is the right action under the TOP's Operating Plan (TOP-001-6 R14; EOP-011-4 R1.2.5), and the generation then lets the TOP restore those customers. The RC is informed of the Emergency (TOP-001-6 R8).

    Why the others aren't:
    A. The line is already beyond every rating the owner has given; 25 more minutes of overload risks sag into clearances or damage, and an unplanned trip of the area's main supply.
    C. The TOP doesn't need RC approval to shed load under its own Operating Plan when an Emergency requires it; it informs the RC (TOP-001-6 R8), and waiting for approval extends the overload.
    D. Opening the area's main supply drops far more than 70 MW and may overload whatever is left; shedding a measured block fixes the overload with the least interruption.

    Sources: FAC-011-4, R6 (Part 6.1.1); TOP-001-6, R8 and R14; EOP-011-4, R1 (Part 1.2.5)

  2. Question 5 · Emergency Preparedness

    What is a GMD Vulnerability Assessment, as the NERC Glossary defines the term?

    1. A real-time evaluation of the GIC flowing in each transformer during an active geomagnetic storm
    2. A documented set of operator actions for when GMD conditions reach preset thresholds
    3. A forecast of geomagnetic storm strength and timing issued to TOPs by their RC
    4. A documented study of the system's susceptibility to GMD voltage collapse, Cascading or equipment damage

    Show the answer

    D. A documented study of the system's susceptibility to GMD voltage collapse, Cascading or equipment damage Why D is best: The Glossary defines a GMD Vulnerability Assessment as a documented evaluation of potential susceptibility to voltage collapse, Cascading, or localized damage of equipment due to geomagnetic disturbances. It is a planning study, made ahead of time, that shows where the system is weak; the operating response lives in the TOP's GMD Operating Procedure under EOP-010-1, and space weather information comes from the RC.

    Why the others aren't:
    A. Monitoring GIC during a storm is a real-time operating activity; the assessment is a documented study made ahead of time, not a live evaluation.
    B. Operator actions triggered by preset conditions belong in the TOP's GMD Operating Procedure (EOP-010-1 R3); the assessment evaluates susceptibility rather than prescribing actions.
    C. Forecasts of storm strength and timing are the space weather information the RC disseminates under EOP-010-1 R2, not a vulnerability assessment.

    Sources: NERC Glossary of Terms: Geomagnetic Disturbance Vulnerability Assessment; EOP-010-1, R2 and R3

  3. Question 6 · Emergency Response

    A storm tripped the Hollowden–Redhurst 345 kV line, one of three 345 kV paths into the Hollowden area, and a patrol found nothing. At 16:05 both breakers are closed and SCADA shows the line energized. The study for this loading expects it to carry about 350 MW, but it reads 40 MW. The other two paths read 117% and 121% of their Normal Ratings, about what they read before the reclosing, and both are within their 4-hour Emergency Ratings. What should the operator conclude and do?

    1. Count N-1 security as restored, and have the BA redispatch flow onto the line
    2. Count N-1 security as restored, and have the field find out why
    3. Count N-1 security as not restored, and have the BA redispatch flow onto the line
    4. Count N-1 security as not restored, and have the field find out why

    Show the answer

    D. Count N-1 security as not restored, and have the field find out why Why D is best: A line returned to service restores N-1 security only if it actually carries its share. Here the other two paths are unchanged and the line reads 40 MW against 350 MW expected, so something keeps it from taking load: an open disconnect or jumper, a breaker closed into the wrong bus section, or bad status or telemetry. The Real-time Assessment assumes the model's topology (Glossary), and until the discrepancy is explained its N-1 results cannot be trusted. The operator keeps the other two paths within their ratings in the meantime (FAC-011-4 R6, Part 6.1.1) and has the field find the cause.

    Why the others aren't:
    A. Closed breakers do not prove the line is in the circuit, and pushing flow onto a line that is not carrying its share is guesswork; the cause must be found first.
    B. Sending the field is right, but N-1 cannot be counted as restored while the line carries 40 MW against 350 MW expected and the other paths are unchanged; until the cause is found, the assessment's N-1 results cannot be trusted.
    C. N-1 is rightly not counted, but redispatching flow onto a line that is not taking its share is guesswork; the field has to find the open path or bad data first, while the other two paths are kept within ratings.

    Sources: NERC Glossary of Terms: Real-time Assessment; TOP-001-6, R10 and R13; FAC-011-4, R6 (Part 6.1.1)

  4. Question 7 · Transmission

    The Brookport–Quarrycroft 230 kV line has a permissive overreaching transfer trip (POTT) scheme at both ends, backed by step-distance zones. Brookport is a strong source. Quarrycroft is supplied only by an inverter-based solar plant, so a fault on the line close to Quarrycroft leaves too little current to operate the Quarrycroft relays. The Quarrycroft terminal has weak-infeed logic in service. How will Brookport clear such a fault?

    1. After its zone 2 delay: Quarrycroft sends no permissive of its own
    2. Instantly on zone 1: Brookport's zone 1 reaches the whole line
    3. After remote backup at other stations: the scheme blocks Brookport while Quarrycroft is silent
    4. At high speed: Quarrycroft echoes back the permissive it receives from Brookport

    Show the answer

    D. At high speed: Quarrycroft echoes back the permissive it receives from Brookport Why D is best: In a POTT scheme each end trips at high speed only when its own overreaching element operates and a permissive arrives from the other end. A weak terminal, such as one fed by inverter-based resources, may see too little fault current to operate its relays, so it sends no permissive and the strong end must wait for its zone 2 delay. Weak-infeed logic fixes this: when the weak terminal receives a permissive and sees no fault behind it, it sends the signal back, so the strong end trips at high speed, and the weak end can be set to trip too when its voltage is low. Without the logic, the strong end would clear in zone 2 time, as in the weak-infeed example in PRC-004-6's technical basis.

    Why the others aren't:
    A. That is what would happen without weak-infeed logic. With it in service, Quarrycroft returns the permissive, so Brookport does not have to wait out its zone 2 delay.
    B. Zone 1 is set to reach only about 80 to 90 percent of the line, so a fault close to Quarrycroft lies beyond Brookport's zone 1. It relies on the permissive or on zone 2 time.
    C. A POTT scheme does not block anything; a missing permissive only removes the high-speed trip. Brookport's own zone 2 would still clear the fault after its delay.

    Sources: PRC-004-6, Supplemental Material (Example R5i: weak infeed, no permissive returned, line tripped timed); NERC Glossary of Terms: Protection System (communications systems necessary for correct operation of protective functions); Miller and Malinowski, Power System Operation, 3rd ed.

  5. Question 8 · Communications and Data

    A failed transducer makes the MW reading at the Drumside end of the Drumside–Eastcroft 230 kV line flick between 0 and 900 MW, setting off the line's overload alarm several times a minute. The Eastcroft end reads a steady 260 MW, and a technician can't reach Drumside until tomorrow. How should the alarm be handled?

    1. Inhibit both ends' alarms, and watch the Eastcroft reading by eye
    2. Inhibit the Drumside point's alarm, and enter its last good value by hand
    3. Inhibit the Drumside point's alarm and alarm on the Eastcroft end
    4. Inhibit both ends' alarms, and alarm on the estimator's flow for the line

    Show the answer

    C. Inhibit the Drumside point's alarm and alarm on the Eastcroft end Why C is best: A point that alarms falsely several times a minute buries real alarms and trains operators to acknowledge without reading. The fix should be narrow: inhibit the alarm on the failed Drumside point only, log it and pass it on at shift change, and keep the line monitored and alarmed on the good Eastcroft reading, so a real overload would still be seen. Disabling or raising the line's limits removes that protection altogether.

    Why the others aren't:
    A. Inhibiting the Eastcroft alarm too leaves the line's protection to someone's eyes; the Eastcroft end reads steadily and can carry the alarm.
    B. A last good value stays fixed while the flow changes, so it can't alarm on a real overload; the live Eastcroft reading can.
    D. Inhibiting the Eastcroft alarm gives up the steady direct reading, and the estimator is fed the flickering Drumside value unless it is removed, so its flow for the line can be distorted.

    Sources: TOP-010-1(i), R1 (Parts 1.2 and 1.3); TOP-001-6, R10 (Part 10.1)

  6. Question 9 · Resource and Demand Balancing

    The Wrenbank battery (100 MW / 200 MWh) connects through the Wrenbank–Maplemount 138 kV line, which also serves 40 MW of local load at Wrenbank. At 17:55 the battery is charging at 80 MW to absorb surplus solar; at 18:30 the BA plans to have it discharge at its full 100 MW. How will the flow on the line change?

    1. From 40 MW into Wrenbank to 60 MW out of it, a 100 MW swing
    2. From 80 MW into Wrenbank to 100 MW out of it, a 180 MW swing
    3. From 120 MW into Wrenbank to 20 MW into it, a 100 MW swing
    4. From 120 MW into Wrenbank to 60 MW out of it, a 180 MW swing

    Show the answer

    D. From 120 MW into Wrenbank to 60 MW out of it, a 180 MW swing Why D is best: A battery is a load while charging and a generator while discharging, so its effect on nearby flows swings by the sum of the two, not the difference. At 17:55 the line carries the 40 MW load plus 80 MW of charging, 120 MW into Wrenbank; at 18:30 the battery's 100 MW covers the 40 MW load and sends 60 MW out, so the flow reverses in a 180 MW swing. The TOP's assessments must cover both directions, since a line or transformer can be limiting in one and not the other.

    Why the others aren't:
    A. Charging is real power drawn through the line, just like load; leaving it out understates the starting inflow by 80 MW.
    B. Leaving out the 40 MW of local load misstates both flows, even though the size of the swing comes out the same.
    C. Counting the discharge but keeping the 80 MW charging load forgets that charging stops when discharge begins; the swing is 180 MW, not 100.

    Sources: NERC Glossary of Terms: Inverter-Based Resource (battery energy storage systems); NERC Glossary of Terms: Real-time Assessment

  7. Question 10 · Contingency Analysis and Reliability

    A post-Contingency result on the Fallwick–Valegate 345 kV line needs 40 MW of relief before the Contingency. One option is curtailing, through the RC, a 400 MW Interchange schedule whose distribution factor on the line is 5%. The other is lowering Kestrelley 80 MW (0.6 MW of relief per MW), with the BA replacing it from units that don't load the line. Which is the better choice?

    1. Curtail the full 400 MW schedule
    2. Lower Kestrelley 40 MW and curtail 200 MW of the schedule
    3. Lower Kestrelley 40 MW
    4. Lower Kestrelley 80 MW

    Show the answer

    D. Lower Kestrelley 80 MW Why D is best: A schedule's distribution factor is the share of it that flows over the facility, so curtailing all 400 MW at 5% would take only 20 MW off Fallwick–Valegate, half the relief needed. Lowering Kestrelley 80 MW at 0.6 gives about 48 MW, enough on its own. Curtailing schedules with small distribution factors disrupts transactions across several areas for little relief; a unit with a large factor is the targeted tool.

    Why the others aren't:
    A. The schedule is larger, but only 5% of it crosses the line; cutting all 400 MW relieves about 20 MW, half of what's needed.
    B. Two hundred MW at 5% gives 10 MW and 40 MW at 0.6 gives 24 MW, 34 MW in all, short of the 40 MW needed.
    C. Forty MW from Kestrelley at 0.6 gives only 24 MW of relief, short of the 40 MW needed; it treats each MW moved as a MW off the line.

    Sources: NERC Glossary of Terms: Distribution Factor; NERC Glossary of Terms: Generator Shift Factor; EOP-011-4, R1 (Part 1.2.4)

  8. Question 11 · Emergency Preparedness

    A band of severe ice and wind is forecast to cross your Transmission Operator Area tonight. Your RC has not declared conservative operations for the RC Area. Your shift supervisor wants to defer two planned line outages, commit an extra unit for voltage support and reduce a local interface transfer. Can the TOP do this?

    1. No; the RC declares conservative operations and assigns each TOP's steps
    2. No; the TOP needs the BA's approval to change unit commitment
    3. Yes; the TOP acts to keep its area reliable and informs the RC
    4. Yes, after the RC has declared an Energy Emergency Alert

    Show the answer

    C. Yes; the TOP acts to keep its area reliable and informs the RC Why C is best: TOP-001-6 R1 requires the TOP to act to maintain the reliability of its Transmission Operator Area through its own actions or by issuing Operating Instructions; it does not wait for the RC to declare anything. Deferring outages goes through the RC's outage process (IRO-017-1 R2), the unit is committed by Operating Instruction or through the BA, and the RC is kept informed (R8 where an Emergency could result). An RC declaration simply makes the posture Wide Area.

    Why the others aren't:
    A. An RC may declare a Wide Area posture, but it does not have to before a TOP acts: nothing stops a TOP from posturing its own area for a known threat, and TOP-001-6 R1 requires it to act.
    B. The TOP can issue Operating Instructions to GOPs and BAs for reliability, and they must comply unless an exception applies (TOP-001-6 R3); BA approval is not a precondition.
    D. An EEA concerns a BA's capacity or energy shortfall; it has nothing to do with whether a TOP may posture its system ahead of a storm.

    Sources: TOP-001-6, R1, R3 and R8; IRO-017-1, R2

  9. Question 12 · Emergency Response

    Your island has four sources on line. Which one is the best choice to regulate the island's frequency in isochronous control?

    1. The 400 MW steam unit, at 300 MW and able to ramp 3 MW per minute
    2. The 50 MW combustion turbine, now at 47 MW of its 50 MW rating
    3. The 120 MW hydro unit, now at 55 MW with fast gate response
    4. The 80 MW wind plant, now at 30 MW in a steady wind

    Show the answer

    C. The 120 MW hydro unit, now at 55 MW with fast gate response Why C is best: The regulating unit must follow every load step quickly in both directions, so it needs fast response and room above and below its output. The hydro unit has 65 MW of room up, room down, and responds in seconds. The steam unit's 3 MW per minute cannot follow load blocks of several MW, the combustion turbine has only 3 MW of room up, and the wind plant's output depends on the wind.

    Why the others aren't:
    A. A 3 MW per minute ramp is far too slow to follow load blocks of several MW, so frequency would sag after each one.
    B. With only 3 MW of room above its output, the turbine would hit its maximum on the first sizable block and stop regulating.
    D. A wind plant's output follows the wind; it cannot raise output on demand to hold frequency unless it is held back below what the wind allows.

    Sources: EPRI Power System Dynamics Tutorial (2009); NREL, Electricity Generation Baseline Report (2017); DOE, Active Power Controls from Wind Power: Bridging the Gaps (2014)

  10. Question 13 · Transmission

    Your Real-time Assessment, which models part of the adjacent TOP's system from data you obtain, shows that loss of your Bluffburn–Covehaven 230 kV line would load the adjacent TOP's Rowanburn–Southgrove 230 kV line above its Emergency Rating. Nothing in your own area is affected. What should you do?

    1. Tell the adjacent TOP, and redispatch your own units now to clear it
    2. Tell the adjacent TOP and the RC, and open Bluffburn–Covehaven now to help on your side
    3. Tell the adjacent TOP and the RC, and be ready to take actions on your side that would help
    4. Clear the result now by redispatching your own units, and tell the RC afterward

    Show the answer

    C. Tell the adjacent TOP and the RC, and be ready to take actions on your side that would help Why C is best: TOPs obtain and use data for outside Facilities they identify as necessary (TOP-001-6 R10, Part 10.4) because their Contingencies can affect neighbors. The adjacent TOP owns the SOL and must initiate its own Operating Plan, so it needs to know; the RC, which sees the Wide Area, needs to know too, and may already be coordinating it. Your TOP may hold the most effective relief, so you stand ready to act in coordination with them.

    Why the others aren't:
    A. Telling the adjacent TOP is right, but it owns the SOL and initiates its own Operating Plan; redispatching on your own before it and the RC have a plan may duplicate or undo their actions.
    B. Opening the line causes the very outage whose effect is the concern, and pushes its flow onto the neighbor's Facilities now.
    D. Acting before the adjacent TOP and the RC know may duplicate or undo their own actions; the exceedance is on their Facility, so relief is coordinated with them first, not reported afterward.

    Sources: TOP-001-6, R10 (Part 10.4) and R8; IRO-008-3, R5; TOP-001-6, R14

  11. Question 14 · Communications and Data

    At 02:00 the Cassstead 138 kV hydro unit shows its breaker closed, −2 MW and +45 Mvar, and nearby 138 kV voltages are at the low end of their schedule. The GOP's telemetry has been reliable. A trainee thinks the MW point has failed, because a unit on line should be producing real power. What is the most likely explanation?

    1. The MW transducer is faulty; the unit is generating MW it doesn't show
    2. The unit is running as a synchronous condenser, producing Mvar without real power
    3. The unit has tripped; its Mvar reading is frozen at its last value
    4. The unit is motoring; it draws tens of MW that the point doesn't show

    Show the answer

    B. The unit is running as a synchronous condenser, producing Mvar without real power Why B is best: Many hydro units can run as synchronous condensers: with the water shut off, the unit stays connected and spinning, drawing only enough real power to cover its losses, while its excitation lets it supply or absorb Mvar. At 02:00, with voltages at the low end of schedule, supplying 45 Mvar this way is just what the unit would be asked to do. The readings are consistent and valid.

    Why the others aren't:
    A. A synchronized unit doesn't have to produce real power; in condensing mode it supplies reactive power with essentially no MW, and the GOP's telemetry has been reliable.
    C. A tripped unit would show its breaker open; here the breaker is closed and the GOP's telemetry is live and reliable.
    D. Condensing draws only enough real power to cover losses, a few MW at most; tens of MW of motoring would show up in the bus balance.

    Source: Miller and Malinowski, Power System Operation, 3rd ed. (synchronous condensers and reactive sources)

Want a full set like these?

The free NERC TO practice test has 15 other questions, then your score for each part and every answer explained. No account needed.

Take the free practice testGet all 20 practice tests for $79

How the NERC TO pack works

Between today and test day: full tests on the clock, every miss brought back until you've got it, and a plan to your date.

20 full tests of 120 questions, on the published time limit. The real test's on-screen tools: basic and scientific calculators, strike out, highlight and a scratch pad. Display gives you larger text, or white on black, in every test.

Every question you miss comes back 2 days later, then again, until you've answered it right on two different days. Drills by area use the questions you've already met.

Your score, the likely range of your accuracy, and the 76% pass mark the publisher states. Never a pass prediction.

Add the date and every day is laid out: as many full tests as fit, each one gone over, rest days, and a light day before the test. It goes in your calendar too.

NERC TO test format

Every practice test is one timed section.

SectionQuestionsTimeAnswer choices
NERC Transmission Operator exam120180 min4
Total120180 min

Questions are mixed across 6 areas: Resource and Demand Balancing; Transmission; Emergency Preparedness; Emergency Response; Contingency Analysis and Reliability; Communications and Data.

Who it's for

People preparing for NERC's Transmission Operator credential to work as certified system operators in a transmission control center, who want full-length, timed practice across all six domains of NERC's TO content outline.

What is the NERC TO exam?

The NERC Transmission Operator (TO) exam is one of four certification exams in the System Operator Certification Program run by the North American Electric Reliability Corporation (NERC). NERC's System Operator Certification page says the program exists so that employers have system operators who meet minimum qualifications, that the exam shows knowledge of NERC's Reliability Standards and the basic principles of bulk power system operations, and that it prepares operators to run the system in normal and emergency operations. Passing gives you a NERC-certified system operator certificate at the TO level, valid for three years.

NERC's Program Manual V4.2 (effective March 25, 2025) lists the four exams:

Exam Questions Scored Cut score
Reliability Coordinator (RC) 140 120 92
Balancing, Interchange, and Transmission Operator (BT) 140 120 92
Transmission Operator (TO) 120 100 76
Balancing and Interchange Operator (BI) 120 100 76

The TO exam is for operators who monitor and operate the transmission system from a control center. NERC lists no prerequisite: its Program Manual and certification pages ask for no degree, work experience, employer sponsorship or training course. You need a SOCCED account, the attestation in the exam application and the fee. If you hold the TO credential and later want another one, you pass that credential's exam. NERC certification types: TO, BT, BI and RC compares the four.

One naming detail trips people up. NERC's exam calls this credential "TO", but in the Reliability Standards the Transmission Operator function is abbreviated TOP, and "TO" there means Transmission Owner. A standard that applies to the TO, such as relay loadability in PRC-023, is about the equipment owner, not the operator.

NERC TO exam format and timing

  • 120 multiple-choice questions. 100 are scored and 20 are experimental. NERC uses the experimental ones to collect statistics before they ever count, and you aren't told which they are. NERC's Exam Resource Materials cut the experimental count from 25 to 20 on January 24, 2025, so older guides may still say 25.
  • 3 hours for the exam. Before it there's a 15-minute tutorial and an untimed nondisclosure agreement, so NERC says to allow at least 3.25 hours. Be inside the testing center at least 30 minutes early for the ID check.
  • At a Pearson VUE testing center. You bring two current IDs: one government-issued with your photo and signature, plus a second one.
  • What you get: a noteboard and marker, and on-screen basic and scientific calculators. Your own calculator, watch, phone and notes stay out.
  • Breaks: you may use the restroom, but the clock keeps running.

Test-day rules, scheduling and ID are in NERC TO exam format, registration and test day.

What's on the NERC TO exam: the six domains

NERC's TO content outline, effective June 1, 2023, sets how many of the 100 scored questions come from each domain and subarea. It's still the current outline: NERC hasn't announced a newer one.

Domain Scored Subareas (scored questions)
1. Resource and Demand Balancing 13 Interchange scheduling and coordination 1, reserves 1, AGC 1, ACE 1, frequency 3, load forecasting 2, generation equipment 2, energy sources 2
2. Transmission 29 Protection and control 5, voltage and reactive 5, electrical fundamentals 4, reconfiguration and switching 5, operating limits 5, transmission equipment 5
3. Emergency Preparedness 10 Same-day and next-day planning 4; weather, natural disasters and geomagnetic disturbances 4; anticipated capacity deficiency 2
4. Emergency Response 16 System restoration 5, response to system disturbances 4, response to capacity emergencies 2, loss of control center 2, loss of analysis and monitoring tools 3
5. Contingency Analysis and Reliability 20 Contingency analysis 4, network analysis tools such as state estimators 4, response to contingency analysis results 4, SOLs 4, IROLs 4
6. Communications and Data 12 Reporting requirements 3, communication methods such as three-part communication and RCIS 3, data validity and verification 4, telemetry and communications equipment 2
  • Transmission is the largest domain, almost a third of the exam. It covers how voltage and reactive power behave, what protection systems and Remedial Action Schemes do, switching and equipment. See NERC TO voltage, reactive power and protection basics.
  • Contingency Analysis and Reliability asks how operators study "what if this element trips", use the state estimator and act on the results. See NERC TO contingency analysis and Real-time Assessments. Its SOL and IROL questions, together with Transmission's operating limits, are covered in NERC TO SOLs and IROLs.
  • Emergency Preparedness and Emergency Response together are 26 questions: next-day planning, weather and geomagnetic disturbances, Energy Emergency Alerts, load shedding, losing the control center and restoring the system from Blackstart Resources. See NERC TO emergency operations and system restoration.
  • Communications and Data covers the communication protocols in COM-002, the communication capabilities in COM-001, event reporting under EOP-004 and the notifications in TOP-001. See NERC TO three-part communication and reporting.
  • Resource and Demand Balancing is the Balancing Authority's world (frequency, ACE, reserves, AGC and interchange), and it's on the TO exam even though the BAL standards don't apply to a Transmission Operator. See NERC TO resource and demand balancing for what a Transmission Operator needs from it.

The outline also lists 31 job tasks the questions are tied to, from adjusting flow control devices to directing system restoration and monitoring Remedial Action Schemes.

NERC TO question types: recall, application and analysis

NERC's Exam Resource Materials say every question is written at one of three levels of cognitive complexity, and give one sample question for each:

  • Recall questions ask for a fact, definition or procedure you could find in a textbook or standard. NERC's sample asks which of four kinds of equipment and resources can provide Operating Reserve.
  • Application questions give you data or a situation and ask you to apply a rule to it. NERC's sample describes a Balancing Area that is short of generation, already importing as much as it can, with voltage decaying, and asks what the system operator should do.
  • Analysis questions ask you to weigh several facts and judge the best course of action. NERC's sample describes an interconnected system with interchange schedules that has lost its frequency indication but still has good tie-line metering, and asks which control mode is most appropriate.

Recall questions reward reading the standards and Glossary closely. Application and analysis questions reward knowing why a rule exists, so you can spot which one decides the situation in front of you.

How the NERC TO exam is scored

You pass with 76 correct out of the 100 scored questions. That cut score has been in effect since June 1, 2020; before then it was 74. A panel of practitioners sets it through a standard-setting study, judging every question against a definition of minimum acceptable competence, and NERC builds every exam form to be equal in difficulty. The cut score is one count of correct answers for the whole exam; NERC's materials give no separate minimum for each domain.

You get a pass/fail score report at the end of the exam, and Pearson VUE emails you a link to it. NERC's Program Manual describes only a pass or fail result. If you pass, you receive a certificate signed by NERC's CEO, dated the day you passed.

NERC doesn't publish a pass rate for the TO exam on its own. Its exam statistics, updated September 15, 2026, give a pass rate of 60.91% so far in 2026, for all four exams combined. More on the cut score and what makes the exam hard is in NERC TO passing score and difficulty.

Registering for the NERC TO exam, fees and retakes

You register and pay in SOCCED, NERC's certification database. After you pay, a link to schedule with Pearson VUE appears in your SOCCED account.

  • Fee: $700 per exam, from NERC's candidate fee schedule effective January 1, 2024.
  • Eligibility: each payment covers one attempt and lasts 365 days. Unused, the fee is forfeited.
  • Scheduling: book at least 24 hours ahead. Reschedule or cancel at least 48 hours before the appointment to keep your fee.
  • Accommodations: request them with NERC's form and a letter from your health care provider through the SOCCED Help Center, and wait for the decision before you schedule.
  • Retakes: after a failed exam you wait 42 calendar days before sitting for any of the four exams, then pay again. NERC doesn't state a limit on attempts.

SOCCED itself is changing. According to NERC's transition timeline, it's unavailable from October 26 through November 4, 2026, and no exams can be scheduled or taken in that time. The new SOCCED goes live on Thursday, November 5, 2026, and existing users reset their passwords then. Pearson VUE stays the exam vendor. The step-by-step version is in NERC TO exam format, registration and test day.

Keeping your NERC TO credential

The certificate lasts three years. To renew a TO credential, the Program Manual requires 140 continuing education hours in those three years, including at least 30 hours on NERC Reliability Standards and at least 30 hours of simulation (tabletop exercises, simulators, emergency and restoration drills). The renewal fee is $475. If you're short of hours when the credential expires, it's suspended for up to 12 months, during which you can't perform NERC-certified tasks. Earning the hours in that time reinstates it; after 12 months it expires and you take the exam again. Planning the hours is covered in NERC certification maintenance and CE hours.

NERC's approved references for the TO exam

NERC's Exam Resource Materials (January 24, 2025) say the content outline and its list of approved references are the best sources to prepare from. The list:

  1. NERC Reliability Standards, with primary interest in the Glossary of Terms and the BAL, COM, EOP, FAC, INT, IRO, PRC, TOP and VAR standards. The current versions are on NERC's US Reliability Standards page.
  2. Power System Operation, third edition, by Miller and Malinowski: chapters 1–3, 5–6 and 10–12.
  3. EPRI's Power System Dynamics Tutorial (July 2009, report 1016042, free from EPRI): the Glossary and chapters 2–9 and 11.
  4. The supplement to the EPRI tutorial, hosted by NERC.
  5. Power System SCADA and Smart Grids, first edition, by Thomas and McDonald: the SCADA and EMS sections.
  6. Practical Power System Operation, first edition, by Ebrahim Vaahedi: chapters 2–8, 10 and 12.
  7. NREL's Electricity Generation Baseline Report (January 2017): chapters 5–13.
  8. Active Power Controls from Wind Power: Bridging the Gaps (January 2014): chapters 3–4.

The standards change more often than the books. The definition of System Operating Limit changed on April 1, 2024, and TOP-003-7 took effect on October 1, 2026, so check the version in force before you trust an older summary.

How to prepare for the NERC TO exam

Study time should follow the points. Transmission (29) and Contingency Analysis and Reliability (20) are almost half the scored questions; the two emergency domains add 26 more. Read the standards that apply to a Transmission Operator requirement by requirement, put each one in your own words, and learn the Glossary terms they lean on: SOL, IROL, Real-time Assessment, Operating Instruction, Emergency, Blackstart Resource. The NERC Glossary terms for the TO exam and the NERC TO cheat sheet put them in one place.

The NERC TO study plan splits your hours by domain weight, week by week, then moves to full exams on the clock. Start with the free NERC TO practice test to see where you stand.

How these NERC TO practice exams work

Each of the 20 practice exams has 120 original four-option questions on one 3-hour clock, spread across the six domains in the same proportions as NERC's outline. NERC adds 20 unscored experimental questions to the real exam; we don't, so every question is scored.

At the end you see your score for each of NERC's six domains, weakest first, and every question has an explanation of why the right answer is right, with its sources, such as the Reliability Standard or Glossary term it rests on. The free practice test has 15 questions, with every answer explained, and needs no account.

NERC TO exam questions people ask

How long is the NERC TO exam?

3 hours for 120 questions, which is 90 seconds a question. With the tutorial and the nondisclosure agreement, NERC's Program Manual says to allow 3.25 hours, plus 30 minutes early for the ID check.

How hard is the NERC TO exam?

There's no TO-only pass rate to judge by. NERC's 2026 figure so far, for all four exams together, is 60.91%, from its exam statistics. The difficulty is mostly breadth, and keeping up with standards that change. More in NERC TO passing score and difficulty.

Can I take the NERC TO exam online?

NERC's Program Manual describes taking the exam at a Pearson VUE testing center and doesn't describe an online option. Check Pearson VUE's NERC page when you book.

Do I need to work for a utility to take it?

NERC's Program Manual and certification pages list no requirement to be employed by a utility or other registered entity, and no education or experience prerequisite. You need a SOCCED account, the attestation in the application and the fee.

Is there an official NERC practice exam?

NERC's Exam Resource Materials include one sample question for each cognitive level, and its resources page doesn't list an official practice exam. The outline and the reference list are what NERC points you to.

NERC TO guides

NERC TO video lessons

Free lessons on ExamVanta's YouTube channel: the NERC TO sections, the timing and worked practice questions.

Watch the whole NERC TO series on YouTube

NERC TO practice: common questions

What is the NERC Transmission Operator (TO) exam?

It's one of the four computer-based exams in NERC's System Operator Certification Program, alongside Reliability Coordinator (RC), Balancing, Interchange and Transmission Operator (BT), and Balancing and Interchange Operator (BI). NERC says the exams test knowledge of its Reliability Standards and the basic principles of bulk power system operations. Passing gives you NERC's Transmission Operator credential, valid for three years, which you keep by earning continuing education hours.

How many questions are on the NERC TO exam?

120 multiple-choice questions. 100 are scored, and 20 are experimental questions NERC is trying out: they don't count, and you aren't told which they are. NERC's TO content outline (effective June 1, 2023) spreads the 100 scored questions over six domains: Transmission 29, Contingency Analysis and Reliability 20, Emergency Response 16, Resource and Demand Balancing 13, Communications and Data 12, and Emergency Preparedness 10.

What's the passing score for the NERC TO exam?

76 correct out of the 100 scored questions, the cut score in effect since June 1, 2020 (it was 74 before). A panel of practitioners sets it through a standard-setting study, and NERC builds each exam form to be equal in difficulty. You get a pass/fail score report at the end of the exam, and Pearson VUE emails you a link to it.

How much does the NERC TO exam cost?

$700 per exam, according to NERC's candidate fee schedule (effective January 1, 2024). You pay in SOCCED, NERC's certification database, and each payment gives you one exam eligibility that lasts 365 days. If you don't test within that time, the fee is forfeited. Renewing the credential every three years costs $475.

How do I register for the NERC TO exam?

Create a SOCCED account in the name shown on your ID, apply for the TO exam and pay. A link to schedule with Pearson VUE then appears in your SOCCED account. Book at least 24 hours ahead, and reschedule or cancel at least 48 hours before your appointment to keep your fee. NERC lists no education or experience prerequisite. SOCCED is moving to a new system: it's unavailable from October 26 through November 4, 2026, and the new SOCCED opens on November 5, 2026, when existing users reset their passwords.

Can I retake the NERC TO exam if I fail?

Yes. You wait 42 calendar days from the failed exam before you can sit for any of the four NERC credential exams, then apply and pay again, because each eligibility covers one attempt. NERC's Program Manual doesn't state a limit on the number of attempts.

Can I use a calculator on the NERC TO exam?

Not your own. NERC's Program Manual bars personal calculators, watches, phones, reference materials and recording equipment. The exam provides on-screen basic and scientific calculators, and you get a noteboard and marker for working; the proctor swaps a full noteboard for a clean one.

How should I prepare for the NERC TO exam?

Start with NERC's two preparation documents: the TO content outline and the Exam Resource Materials, which list the approved references. Give most of your time to the largest domains, Transmission (29 scored questions) and Contingency Analysis and Reliability (20), and read the standards NERC names as primary: the Glossary and the BAL, COM, EOP, FAC, INT, IRO, PRC, TOP and VAR standards. Then take full 120-question practice exams on the 3-hour clock and read the explanation for every question you miss.

Are these real NERC exam questions?

No. Every question is original, written by ExamVanta to NERC's published TO content outline and the Reliability Standards in force. NERC's exam questions are confidential and belong to NERC: candidates accept a nondisclosure agreement, and sharing or selling exam questions can cost a credential. Nobody can legitimately sell them.

Is there a free NERC TO practice test?

Yes. The free practice test has 15 questions, untimed, with every answer explained when you finish, and you don't need an account. The 20 full practice exams have 120 questions each on the 3-hour clock, with every question scored and your results shown for each of NERC's six domains.

Sources for the retakes line beside the price: 42 calendar days (nerc.com) and $700 (nerc.com). Checked November 16, 2026.

ExamVanta is not affiliated with, endorsed by or sponsored by the North American Electric Reliability Corporation (NERC) or Pearson VUE. These are original practice questions written by ExamVanta, not questions from the real exam. They aren't operating instructions for any real system, and they don't replace NERC's Reliability Standards or your company's procedures. Practice scores are raw results, not official scores or predictions. Page updated November 24, 2026.

See where you stand on the NERC TO

Start with the free practice test: 15 questions, untimed or at the real test's pace, no account needed. Every answer is explained when you finish.