NERC TO Exam Cheat Sheet

The numbers NERC TO candidates need cold, by exam domain, each with its standard and requirement: RTAs, IROL Tv, EEA levels, EOP-004 reports, COM-002 and more.

Practicing for the NERC TO? Take the free practice test: 15 questions, no account needed.

The NERC Transmission Operator (TO) exam rewards knowing a few dozen numbers exactly. This sheet groups them by the six domains of NERC's TO content outline, with the requirement behind each, in the versions in force on October 31, 2026. Requirements are paraphrased; the exact wording is on NERC's US Reliability Standards page and in its Glossary of Terms.

In the tables, TOP is the Transmission Operator, as the standards abbreviate it (there, "TO" means Transmission Owner). RC is the Reliability Coordinator, BA the Balancing Authority and GOP the Generator Operator.

The exam itself

From NERC's Program Manual V4.2 and fee schedule:

What Number
Questions 120: 100 scored, 20 unscored experimental
Time 3 hours (90 seconds a question); allow 3.25 hours with the tutorial and nondisclosure agreement
Cut score 76 of the 100 scored, since June 1, 2020
Retake wait 42 calendar days
Fee $700 per attempt, usable within 365 days

Worked example: what 76 means. You can't tell which are experimental. With 96 of 120 correct, even if all 24 misses were scored, 100 − 24 = 76 scored answers are right: a pass. Below 76 correct overall, you can't pass; in between, it depends where the misses fell. So 96 (80%) is the lowest total that passes wherever the misses fall. A practice score doesn't predict your result, so build a margin above that.

Domain 1: Resource and Demand Balancing (13 scored questions)

BAL standards apply to Balancing Authorities, but the outline still tests their ideas.

Rule Number Where
Contingency Event Recovery Period 15 minutes Glossary; BAL-002-3 R1
Contingency Reserve Restoration Period Up to 90 minutes after the recovery period Glossary; BAL-002-3 R3
Reporting ACE beyond its BAAL No more than 30 consecutive clock-minutes BAL-001-2 R2
CPS1 At least 100% for each 12 consecutive calendar months BAL-001-2 R1

Domain 2: Transmission (29 scored questions)

FAC-011-4 sets what every RC's SOL methodology must contain; the TOP uses it (TOP-001-6 R25).

Rule Number Where
Flow, no Contingency Within Normal Ratings; an Emergency Rating only if adjustments can finish within its time duration FAC-011-4 R6.1
Flow after a single Contingency Within Emergency Ratings, never above the highest FAC-011-4 R6.2
Voltage Normal System Voltage Limits with no Contingency (emergency limits on the same terms as ratings); emergency limits after one FAC-011-4 R6
System Voltage Limits At or above in-service UVLS relay settings FAC-011-4 R3
Voltage schedule A range, or a target with a tolerance band; copy to the RC and adjacent TOPs within 30 calendar days of a request VAR-001-5 R1
GOP notice to TOP Within 30 minutes of an AVR or stabilizer status change or a reactive capability change; none if restored within 30 minutes VAR-002-4.1 R3, R4
Relay loadability Evaluated at 0.85 per unit voltage and a 30-degree power factor angle; criterion 1: no operation at or below 150% of the highest seasonal Facility Rating (duration nearest 4 hours) PRC-023-6 R1 (owners, not TOPs)
BES Transmission Elements at 100 kV and above; generators connected at 100 kV or above over 20 MVA (unit) or 75 MVA (plant) Glossary

Domain 3: Emergency Preparedness (10 scored questions)

Rule Number Where
Next-day study An Operational Planning Analysis of SOL exceedances TOP-002-5 R1
Next-day plan An Operating Plan for them; entities told their roles; plan given to the RC TOP-002-5 R2, R3, R6
Expected Emergency Tell the RC, known impacted BAs and TOPs TOP-001-6 R8
Emergency plans Reviewed by the RC, with load shed provisions and cold and extreme weather; load shed helpers notified yearly EOP-011-4 R1, R7
Geomagnetic disturbances Operating Procedure or Process, if the TOP Area has a transformer with a high-side wye-grounded winding above 200 kV EOP-010-1 R3

Domain 4: Emergency Response (16 scored questions)

EEA Name Circumstances
1 All available generation resources in use Non-firm sales curtailed; BA concerned about sustaining Contingency Reserves
2 Load management procedures in effect Energy deficient BA still holds minimum Contingency Reserve
3 Firm Load interruption imminent or in progress BA can't meet minimum Contingency Reserve
0 Termination BA can meet Load and Operating Reserve requirements

Only the RC declares an EEA, at any level and in any order; the energy deficient BA updates the RC at least hourly in EEA 2 and 3 (EOP-011-4 R6, Attachment 1).

Rule Number Where
RC passes on an Emergency notification Within 30 minutes EOP-011-4 R5
Tool and telemetry outages Tell the RC and known impacted entities: all planned, and unplanned of 30 minutes or more TOP-001-6 R9
Backup control center Switch in 2 hours or less; yearly test with 2 continuous hours on backup; plan updated within 60 calendar days of a change EOP-008-2 R1, R5, R7
Restoration plan RC approves or disapproves within 30 calendar days; revisions submitted within 90 calendar days of identifying an unplanned permanent BES change; verified every 5 years EOP-005-3 R1, R4, R6; EOP-006-3 R5
Blackstart Resources Each tested every 3 calendar years; GOP reports a capability change within 24 hours EOP-005-3 R7, R13
Restoration training Operators yearly; field switching personnel 2 hours every 2 calendar years EOP-005-3 R8, R9

Domain 5: Contingency Analysis and Reliability (20 scored questions)

Rule Number Where
Real-time Assessment At least every 30 minutes TOP-001-6 R13
IROL Never outside it longer than its Tv; every Tv 30 minutes or less TOP-001-6 R12; Glossary
SOL exceedance Initiate the Operating Plan, then tell the RC what was done TOP-001-6 R14, R15
Differing SOLs Operate to the most limiting TOP-001-6 R18
Who sets limits TOP sets SOLs and gives them to the RC; RC sets IROLs FAC-014-3 R1 to R3
Single Contingencies Loss of a generator, circuit, transformer, shunt device or HVdc pole FAC-011-4 R5
Always communicated IROL, stability limit and pre-Contingency Facility Rating exceedances; voltage below a normal minimum; post-Contingency results with a validated risk of instability, Cascading or uncontrolled separation FAC-011-4 R7.1
Communicated if not resolved in 30 minutes Other post-Contingency rating and emergency voltage exceedances; voltage above a normal maximum FAC-011-4 R7.2
Planned manual load shed Only after all other adjustments FAC-011-4 R6.4

The RC's methodology sets each timeframe.

Domain 6: Communications and Data (12 scored questions)

Rule Number Where
Three-part communication Issue, repeat back (not necessarily word for word), confirm; reissue if wrong COM-002-4 R1
Burst instruction Confirm at least one receiver got it COM-002-4 R1
Protocol review At least every 12 calendar months COM-002-4 R4
In an Emergency Repeat-back and confirmation required outright COM-002-4 R5 to R7
RC Operating Instructions Follow unless physically impossible or against safety, equipment, regulatory or statutory requirements; say so if you can't IRO-001-4 R2, R3
Alternative Interpersonal Communication Tested every calendar month; start repair within 2 hours of a failed test COM-001-3 R9
Interpersonal Communication failure of 30 minutes or more Notify within 60 minutes of detecting it COM-001-3 R10
Data exchange redundancy Tested every 90 calendar days; start restoring within 2 hours of a failed test TOP-001-6 R21
Event report Later of 24 hours or the end of the next business day (4 p.m. local) EOP-004-4 R2
Cyber Reportable Cyber Security Incident: initial notice within 1 hour of determination CIP-008-6 R4

EOP-004-4 thresholds for a TOP (each "or more"): during a BES Emergency, firm load shedding of 100 MW, a 3% system-wide voltage reduction, a 10% deviation from nominal voltage on a Facility for 15 continuous minutes, or an uncontrolled loss of firm load from one incident for 15 minutes (300 MW if last year's peak demand was 3,000 MW or more, otherwise 200 MW); at any time, an island of 100 MW, 3 BES Facilities lost to one disturbance contrary to design, or 30 continuous minutes of control center evacuation or complete loss of Interpersonal and Alternative Interpersonal Communication, monitoring or control.

Numbers that look alike

  • 30 minutes: the longest gap between Real-time Assessments, the ceiling on any Tv, the GOP's AVR notice, the outage that makes a tool or communication failure notifiable, and FAC-011-4's window before an unresolved post-Contingency exceedance is communicated.
  • 2 hours: the most a move to backup may take, but the least the backup test must run. After a failed test, it's when action must start, not finish.

Ask of any number: what starts its clock, and is it a limit or a minimum?

Worked example: from tomorrow's study to today's alarm

An original example, not an exam question. Monday's Operational Planning Analysis shows that on Tuesday, with the Thornbury 345/138 kV transformer out for maintenance, losing a 138 kV line at the afternoon peak would load the Larkfield 138 kV line above its highest Emergency Rating.

  1. Monday: prepare an Operating Plan (TOP-002-5 R2), such as redispatch near Larkfield arranged with the BA; tell its entities their roles (R3); send it to the RC (R6).
  2. Tuesday: Real-time Assessments, at least every 30 minutes (TOP-001-6 R13), watch for it.
  3. If the 14:30 assessment shows it: initiate the plan (R14) and tell the RC what you did (R15). Still unresolved at 15:00? The RC's methodology requires a report (FAC-011-4 R7.2).

Domain guides: resource and demand balancing, voltage and protection, emergency operations, contingency analysis, SOLs and IROLs and communication and reporting. Definitions: NERC TO Glossary terms. Then try the free NERC TO practice test and full NERC TO practice exams.

Free to share: you may copy and share this guide unchanged, for non-commercial purposes such as teaching and study, if you credit ExamVanta and link to this page. It's licensed under CC BY-NC-ND 4.0. Material from other sources quoted or shown in it, such as official text or chart excerpts, keeps its own terms.