Operating limits run through the whole NERC Transmission Operator (TO) exam. NERC's TO content outline gives System Operating Limits (SOLs) 4 scored questions and Interconnection Reliability Operating Limits (IROLs) 4 more, in the Contingency Analysis and Reliability domain, and the Transmission domain has another 5 on operating limits. This guide covers the definitions, who sets each limit and what a Transmission Operator has to do about them, in the versions in force since April 1, 2024.

The definitions below are paraphrased from NERC's Glossary of Terms; read the exact wording there.

What an SOL is, since April 1, 2024

An SOL is now the set of all Facility Ratings, System Voltage Limits and stability limits that apply to specified System configurations, used to monitor and assess the system before and after a Contingency. That definition took effect on April 1, 2024, with FAC-011-4, FAC-014-3, TOP-001-6 and IRO-008-3.

The old definition, which many study materials still use, described an SOL as a single value (MW, Mvar, amperes, frequency or volts) satisfying the most limiting operating criterion for a given configuration. If a source talks about "the SOL" as one number, it's probably older than 2024.

The pieces of the new definition:

  • Facility Rating: the maximum or minimum voltage, current, frequency or power flow through a facility that doesn't violate the rating of any equipment in it. Owners define a Normal Rating, which the equipment can carry through daily demand cycles without loss of life, and an Emergency Rating, which it can carry for a finite period with acceptable loss of life.
  • System Voltage Limit: the maximum and minimum steady-state voltages, normal and emergency, that give acceptable System performance. This term is new with the 2024 definition.
  • Stability limit: the maximum power flow through a point in the system that keeps the system, or the part the limit refers to, stable.

Who sets SOLs and IROLs

  • The Reliability Coordinator writes the SOL methodology (FAC-011-4). It covers how Transmission Operators pick the Facility Ratings to use, how System Voltage Limits are set (at or above any undervoltage load shedding relay settings), how stability limits are found, which Contingencies to study, and how to tell when an SOL exceedance is also an IROL exceedance.
  • The Transmission Operator establishes the SOLs for its part of the Reliability Coordinator Area, following that methodology, and gives them to its Reliability Coordinator (FAC-014-3 R2 and R3).
  • The Reliability Coordinator establishes the IROLs (FAC-014-3 R1) and gives the Transmission Operator the IROLs and stability limits, with their critical Contingencies, in time for its planning and real-time work.
  • The Transmission Operator uses the Reliability Coordinator's methodology when it decides whether an SOL is exceeded, in Real-time Assessments, Real-time monitoring and next-day Operational Planning Analysis (TOP-001-6 R25).

What an IROL is

An IROL is an SOL that, if violated, could lead to instability, uncontrolled separation or Cascading outages that hurt the reliability of the Bulk Electric System. Cascading, in the Glossary, is the uncontrolled successive loss of System Elements triggered by an incident anywhere, causing widespread service interruption that can't be stopped from spreading beyond an area predetermined by studies.

Each IROL has an IROL Tv: the longest time it can be violated before the risk to the Interconnection or other Reliability Coordinator Areas becomes unacceptable. Every IROL's Tv must be 30 minutes or less. TOP-001-6 R12 says a Transmission Operator must not operate outside an identified IROL for a continuous duration longer than its Tv. Learn both halves: 30 minutes is the ceiling for any Tv, but a particular IROL can have a shorter one.

What the Transmission Operator does in real time

TOP-001-6 is the core standard. For SOLs and IROLs, the Transmission Operator:

  • monitors the Facilities and Remedial Action Scheme status in its area, plus outside data it has decided it needs, to find SOL exceedances (R10);
  • makes sure a Real-time Assessment is performed at least every 30 minutes (R13);
  • initiates its Operating Plan to mitigate any SOL exceedance found in monitoring or a Real-time Assessment (R14);
  • tells its Reliability Coordinator what it did to get back within limits (R15);
  • operates to the most limiting value when SOLs differ (R18);
  • stays within each IROL's Tv (R12).

FAC-011-4 R6 sets the yardstick the methodology must use. With no Contingency, flows stay within Normal Ratings and voltages within normal System Voltage Limits; Emergency Ratings or emergency voltage limits may be used only when adjustments to get back within the normal values can be completed within the emergency limit's time duration. After a single Contingency, flows stay within the applicable Emergency Ratings, and never above a Facility's highest Emergency Rating, and voltages within emergency System Voltage Limits. Planned manual load shedding counts as a response only after all other available adjustments have been made.

The day before, TOP-002-5 asks for an Operational Planning Analysis of next-day SOL exceedances and an Operating Plan to deal with them, given to the Reliability Coordinator. VAR-001-5 ties voltage in too: the system voltage schedule is part of the Transmission Operator's plan to operate within SOLs and IROLs.

Worked examples

These are original examples, not exam questions.

1. Using an Emergency Rating before a Contingency. A line has a Normal Rating of 1,000 A and a 30-minute Emergency Rating of 1,150 A. It's carrying 1,060 A. Under the FAC-011-4 R6 framework, running above the Normal Rating is acceptable only if adjustments that bring the flow back below 1,000 A can be completed within the 30 minutes the Emergency Rating allows. If they can't, it's a pre-Contingency SOL exceedance, and the Operating Plan starts now.

2. A post-Contingency exceedance. The same line carries 820 A, inside its Normal Rating. The Real-time Assessment shows that if a parallel line trips, this line would carry 1,310 A, above its highest Emergency Rating of 1,150 A. Nothing is overloaded yet, but this is a post-Contingency SOL exceedance. You initiate the Operating Plan (TOP-001-6 R14), and under FAC-011-4 R7 your Reliability Coordinator's methodology requires post-Contingency exceedances of Facility Ratings to be reported if they aren't resolved within 30 minutes. Afterward you tell the Reliability Coordinator what you did (R15).

3. Counting IROL Tv. An interface IROL has a Tv of 20 minutes. Flow goes above it at 16:40. You have to be back within the limit before 17:00, not 17:10: the 30-minute figure is only the maximum any Tv may be. IROL exceedances are always reported to the Reliability Coordinator under FAC-011-4 R7.

4. Two different limits. Your study gives a tie path 940 MW; the adjacent Transmission Operator's gives 900 MW. Until the difference is resolved, you operate to 900 MW (TOP-001-6 R18).

Mix-ups worth avoiding

  • Every IROL is an SOL; most SOLs aren't IROLs. The difference is the consequence: instability, uncontrolled separation or Cascading.
  • The Transmission Operator sets SOLs; the Reliability Coordinator sets IROLs and the methodology both follow.
  • Pre-Contingency and post-Contingency are both SOL exceedances. A line can be well within its ratings now and still be an exceedance because of what would happen if something else tripped.
  • Reliability Directive is retired. Commands from the Reliability Coordinator are now Operating Instructions, and IRO-001-4 requires a Transmission Operator to follow them unless they can't be physically carried out or would break safety, equipment, regulatory or statutory requirements, and to say so if it can't.

How the studies behind these limits work is in NERC TO contingency analysis and Real-time Assessments, and voltage limits are covered in NERC TO voltage, reactive power and protection basics. The study plan puts this topic in week 3. To practice it, try the free NERC TO practice test or the full NERC TO practice exams.

Watch the video lesson

Free to share: you may copy and share this guide unchanged, for non-commercial purposes such as teaching and study, if you credit ExamVanta and link to this page. It's licensed under CC BY-NC-ND 4.0. Material from other sources quoted or shown in it, such as official text or chart excerpts, keeps its own terms.