Ramsay MultiCrafTest Scores
What a Ramsay MultiCrafTest score means: Ramsay's published norms, a score of 40 of 60 against them, percentiles, employer cut scores and retesting.
Practicing for the Ramsay MultiCrafTest? Take the free practice test: 14 questions, no account needed.
After a MultiCrafTest, most people want to know two things: was my score good, and what was the pass mark? Ramsay Corporation publishes enough about the test to answer the first question roughly. The second has no single answer, because each employer sets its own. This guide explains what Ramsay publishes, what a raw score means against those figures, and how employers use the results.
How the MultiCrafTest is scored
Ramsay's MultiCrafTest product page describes Form A6 as 60 multiple-choice items on journey-level mechanical and electrical maintenance knowledge, in seven craft areas. It comes as a paper test and an online test.
Ramsay's FAQ explains scores in terms of the number of questions answered correctly, so think of your raw score as a count from 0 to 60. A few other points from Ramsay's pages affect what that count means:
- No time limit is published. The product page doesn't list one, so the employer sets the conditions. Check your invitation.
- Every test is proctored, on paper and online, to protect the content and the accuracy of results.
- Employers can drop questions from scoring. The FAQ says Ramsay has advised customers that they may cross out, or not score, items that don't relate to their jobs or equipment. If yours did, your score may be out of fewer than 60.
- Ramsay's public pages don't say whether wrong answers cost points. Read the instructions on the day. If nothing says they do, an unanswered question can only score zero, so leave nothing blank.
Ramsay's pages also don't say whether the employer sees a score for each craft area, or whether you'll be told your score. Ask the employer.
Ramsay's published norms for the MultiCrafTest
The product page lists statistics "calculated from a group of applicants in various industries":
| Statistic | Value | What it means |
|---|---|---|
| Sample size | 3,708 | applicants in the group |
| Mean score | 29.01 | the average raw score, out of 60 |
| Standard deviation | 9.30 | how widely scores spread around the average |
| Reliability (KR-20) | .86 | how consistently the 60 questions measure the same knowledge, on a 0 to 1 scale |
| Standard error of measurement | 3.48 | how far a score typically sits from the person's "true" score |
The first thing to notice is the mean. The average applicant in Ramsay's group answered about 29 of 60 correctly, fewer than half. This is a hard test, written for journey-level people across seven crafts, and few people are expert in all of them. If you finish feeling you missed a lot, that's normal.
The numbers also hang together. The standard error comes from the spread and the reliability: 9.30 × the square root of (1 − 0.86) = 9.30 × 0.374 ≈ 3.48.
What a score of 40 out of 60 means
Take a raw score of 40.
As a percentage, 40 ÷ 60 ≈ 67%. That sounds ordinary, but on a test this hard the percentage on its own says little.
Against the norms, 40 is 40 − 29.01 = 10.99 points above the mean. Divide by the standard deviation: 10.99 ÷ 9.30 ≈ 1.18 standard deviations above average.
As a rough percentile: if scores followed a bell curve, 1.18 standard deviations above the mean would beat about 88% of the group. That's an estimate, not Ramsay's figure. Ramsay's actual percentile tables are in its technical manual and online score reports, which employers see, and real score distributions aren't perfectly bell-shaped.
The same rough estimate for other scores:
| Raw score | Percent correct | Standard deviations from the mean | Rough percentile |
|---|---|---|---|
| 20 | 33% | −0.97 | about 17th |
| 29 | 48% | 0.00 | about 50th |
| 35 | 58% | +0.64 | about 74th |
| 40 | 67% | +1.18 | about 88th |
| 45 | 75% | +1.72 | about 96th |
Allow for measurement error. With a standard error of 3.48, a score of 40 means your true score most likely sits between about 36.5 and 43.5 (40 ± 3.48, roughly two chances in three), and about 95 times in 100 between about 33 and 47 (40 ± 6.8). Two candidates a couple of points apart are, in practice, level.
One caution: the norm group is applicants from many industries. An employer whose applicants are mostly experienced multicraft technicians may see a higher average, so the same 40 could rank lower there.
Percentile versus percentage
Ramsay's FAQ draws the distinction clearly. A percentage is fixed: the share of questions you got right. A percentile rank compares you with other people who took the same test: the 80th percentile means you scored as well as or better than 80% of them. It isn't fixed, because the comparison group grows and changes over time, so the same raw score can carry a different percentile later.
Ramsay's manuals and online score reports give employers percentile charts for exactly this comparison.
How employers set a passing score
There's no official MultiCrafTest pass mark. Ramsay's FAQ says that unless Ramsay performs a job analysis and validation study for the employer, it can't recommend a specific cut score, and that a cut score can vary with the labor market and the job. It also says Ramsay doesn't support customized cut scores outside a formal local validation study.
What Ramsay gives employers instead:
- Technical manuals with normative data, the average score, standard deviation and reliability, and a cumulative percent and percentile chart. Score reports for online tests include the same chart, to help an employer judge where a cut score could sit and what pass rate to expect.
- A suggestion to pilot the test with people already considered qualified for the job, and use their results when setting the cut.
- A recommendation to validate locally for organizations that, for example, have more than 200 employees, a labor agreement or a federal contract.
So the pass mark is the employer's decision. Two plants using the same form can set different ones. If you want to know how your score was used, ask the recruiter. Some employers will tell you; others won't.
Retesting and alternate forms
Ramsay's FAQ says the federal Uniform Guidelines on Employee Selection Procedures and the Standards for Educational and Psychological Testing require employers to give people the opportunity to retest. It says organizations should set written policies on how often and under what conditions. The right interval depends partly on the range and complexity of the test content, and your employer's policy sets it.
Ramsay recommends retesting on an alternate, equivalent form where possible. For the MultiCrafTest, the product page lists alternate equivalent Forms B and C on paper and Form B online, alongside Form A6, a scrambled online version and Spanish versions. So a retest may not repeat the questions you saw. Remembering items won't help much; knowing the trade will.
If you need an accommodation, such as extra time, Ramsay's FAQ says employers should ask when they schedule you. Raise it then, before the test day.
Practice scores aren't Ramsay scores
Ramsay's FAQ says it doesn't sell test preparation materials and hasn't sanctioned any online practice tests or preparation materials. ExamVanta is not affiliated with Ramsay. Our practice tests are original questions in the same seven craft areas, so your practice score is a raw count on our questions. It can't be placed on Ramsay's norms, and it doesn't predict your result.
What a practice score is good for is direction. The score for each craft area shows where the points are leaking, and the explanations show why. Our study plan turns that into three weeks of work, and the mechanical and electrical guides cover the formulas. If you're not sure the MultiCrafTest is your test at all, see which Ramsay maintenance test is yours.
Practice that matches the test
Our Ramsay MultiCrafTest practice tests give you 20 full tests of 60 original questions, mixed across the seven craft areas, with a score for each area and a worked explanation for every question. Start with the free practice test to see where you stand.
Watch the video lesson
- Ramsay MultiCrafTest Time Limit & Passing Score (Form A6) on ExamVanta's YouTube channel
Free to share: you may copy and share this guide unchanged, for non-commercial purposes such as teaching and study, if you credit ExamVanta and link to this page. It's licensed under CC BY-NC-ND 4.0. Material from other sources quoted or shown in it, such as official text or chart excerpts, keeps its own terms.
More Ramsay MultiCrafTest guides
- How to Prepare for the Ramsay MultiCrafTest: A Study Plan
A practical plan for the Ramsay MultiCrafTest: what the seven craft areas cover, how to find your weakest areas, which formulas to know, and how to pace 60 questions.
- MultiCrafTest AC/DC Theory: Three-Phase Power and Safety
AC/DC theory and electrical maintenance for the Ramsay MultiCrafTest: Ohm's law, three-phase power, transformers, voltage drop, grounding, insulation tests and safe work.
- MultiCrafTest Electrical Maintenance: Formulas, Ladder Logic
The electrical side of the Ramsay MultiCrafTest: AC/DC theory, motors and controls, ladder diagrams and PLC signals, with formulas and worked examples.
- MultiCrafTest Hydraulics and Pneumatics: Worked Examples
Hydraulics and pneumatics for the Ramsay MultiCrafTest: force, speed, horsepower and heat, valves, air use and troubleshooting, with worked examples you can check.
- MultiCrafTest Mechanical Maintenance: Formulas and Examples
The mechanical side of the Ramsay MultiCrafTest: hydraulics and pneumatics, welding and rigging, power transmission and pumps, with formulas and worked examples.
- MultiCrafTest Motors and Controls: Starters, VFDs, Prints
Motors, controls and print reading for the Ramsay MultiCrafTest: motor speed and slip, starters, seal-in, reversing, jog, VFDs and ladder prints, with worked examples.
- MultiCrafTest PLCs, Electronics and Test Instruments Guide
PLCs, electronics and test instruments for the Ramsay MultiCrafTest: PLC scan and I/O, 4–20 mA scaling, sensors, safe meter use and logic gates, with worked examples.
- MultiCrafTest Power Transmission: Belts, Gears, Bearings
Power transmission and mechanical maintenance for the Ramsay MultiCrafTest: drive ratios, torque, chains, bearing life, lubrication, alignment and bolting, with examples.
- MultiCrafTest Pumps, Piping and Combustion: Worked Examples
Pumps, piping and combustion for the Ramsay MultiCrafTest: head and pressure, pump power, affinity laws, NPSH and cavitation, water hammer, steam traps and burners.
- MultiCrafTest Welding and Rigging: Sling Angles and Welds
Welding and rigging for the Ramsay MultiCrafTest: sling tension, load share, hitch capacity, electrodes, weld defects, heat input and hot work, with worked examples.
- Ramsay MecTest vs MultiCrafTest: Which Test Is Yours?
Ramsay's maintenance tests compared: MultiCrafTest, MecTest, Maintenance Troubleshooter, MultiCraft Aptitude Test and more, by items, level and content.